st. george village

St. George Village

Roswell, GA

Scope of work included the replacement of all building air conditioning systems that had reached or exceeded their life expectancy, totaling over 200 tons of capacity. Special consideration was paid to new system selections to ensure they fit within existing space constraints - minimizing Architectural and Interiors work. Systems replaced included central station air handling units and associated condensing units, pool dehumidification unit, and packaged rooftop units.

Testimonials

We stand by our work

We’ve been called a lot of things ~ Experienced, easy to work with, and proactive are a few of our favorites.

Ware logo

Working with Proficient Engineering makes the entire construction document process easier for our firm. We feel that Proficient never fails at delivering what we need on time, on budget and as a team player.

Kristen Ware

Ware + Associates

TAC logo

I’m excited that you’ve been selected to help on this project! Y’all are great to work with.

Jonah Pruitt

Architect

The Architecture Collaborative

line+angle logo

Proficient was one step ahead. They knew exactly what to do and made things a lot faster and easier for me. I would absolutely use Proficient again because of how smoothly things went, their ability to meet deadlines, and how flexible the team was with adapting the system’s designs and plans to the owner’s needs.

Nicole Seekely

Owner

Line+Angle