Electrical Site Survey Information

Electrical

10 not that lucky

Recommended steps to perform on site to gather existing electrical system information.

Start from outside.

Look for meter or meters outside.

1 meter pic(516)

Sometimes there are more than one.

2 multiple meters(425)

Sometimes they may be hiding.

3 meters hiding(539)

From there, determine if the building is fed via underground or overhead.  This is important in case the service capacity needs to be increased.

Overhead service is easy to modify with less cost to owner.

Now determine the building electrical characteristics.

Sometimes, if you are lucky, it can be found on the side of a utility transformer.

6 building electrical characteristics(264)

Now determine the building electrical characteristics.  Most of the times, it can be assumed from service disconnect switch nameplate.

All else, it can also be determined from the panels inside.

8 inside panels(432)

Now that we know what the building system is, we need to find out the capacity available to the building.

In this case, it’s relatively easy to find out what it might be.

Suite # is labeled on each meter, which is directly connected to each disconnect switch.

2 multiple meters(425)

However, most of the time, we are not that lucky.

Nameplate will be worn out and not legible, and may need to open the disconnect switch to see what the amp rating of the fuses are.

However, we do not recommend doing this, so Don’t Do It!

10 not that lucky(347)

We can also estimate the service capacity to each space with the size of conduits to each tenant space or the physical size of the disconnect switches…

2 multiple meters(425)

Also can be determined from panel or switchboard nameplate.

8 inside panels(432)

But the size of the panel or switchboard does not necessarily means the capacity of the building. Good assumption, though.

13 from panel or switchboard nameplate ii(097)

The best way to find the capacity is to find the main breaker at the main service entrance equipment.

Main Electrical Room

…Other times, you may have to take multiple pictures to get overall picture.

 

…then take close up shots of each panel including the panel schedule.

16 main electrical room close ups iii(144)
16 main electrical room close ups iv(554)
16 main electrical room close ups v 1(538)

Other equipment

Don’t forget about the transformers. On floor and overhead.

Also take close up of the name plate.

Overall Space

 Site Notes

 Conclusion

  1. Utility Information
  2. Building Electrical System – Voltage, Phase
  3. Electrical system capacity – Amps
  4. Distribution Equipment – Switchboard, panels, disconnects
  5. Other Equipment – HVAC, Plumbing, etc.
  6. A lots of pictures IN FOCUS.

Testimonials

We stand by our work

We’ve been called a lot of things ~ Experienced, easy to work with, and proactive are a few of our favorites.

Benefield Richters logo

We have enjoyed working with Proficient’s Knoxville team to serve a variety of clients from renovation/redevelopment to new development projects. The team has provided fair and competitive pricing, communicated needs and requirements promptly and clearly, maintained schedule, and have been advocates for solutions that balance technical and functional requirements within the parameters of the given project.

Amy Sherrill

Principal, Owner

The Benefield Richters Company

sheffer grant logo

Proficient’s ability to respond quickly with economical solutions has enabled us to complete projects on the always-urgent timelines.

Audrey Grant

Vice President

Sheffer & Grant Architects

sc logo

Proficient is a professional MEP engineering consulting group. They work efficiently and are great to collaborate with. Without exception, all members of Proficient team have been very capable, efficient and friendly. Yes, I would absolutely recommend Proficient to other firms.

Rohit Chib

Design Architect

Studio Chib, LLC